Lacuna Passage - Devlog #49 - The Bridge Art Progress

Over the last few weeks we have been able to shift most of our art development back to Lacuna Passage.  In our last art devlog we showcased the Habitat with shots taken from our PAX East demo, as well as the look of Foundation Base when approaching on foot. Now we are working hard on the next major art asset for Foundation Base, the Bridge.  The Bridge is a pressurized walkway that connects the Habitat, Greenhouse, and Workshop together.  Here are some work-in-progress shots:

You may notice that the Bridge is made up of a plastic similar similar to that of the Greenhouse.  The frame and supports are designed to be suitable for variance in the terrain and flexibility.  The central hub that forms the intersection of the Bridge serves as a pressurized dock for the PRT (Pressurized Roving Transport).  Eventually there will also be attached docking bays for smaller remotely operated scout rovers.

There is still a lot of work to be done on this piece, but we are quite happy with the look so far.  We hope to have the Bridge complete and textured by the end of the month, so be sure to check back next month to see what comes of it.